9th FINA World Swimming Championships 2008 9th-13th april / M.E.N. Arena / Manchester HOME
1 8 1
DAYS TO GO rss

See how the pools will be built in the MEN arena

| 01 May 2007

podcast logoCheck out the podcast section where we have uploaded videos of how the last two temporary pools have been built in Shanghai 2006 and Melbourne 2007.

In Manchester 2 pools will be built in the MEN arena. The main pool will be a competition standard pool where all the action will take place with 7500 seats surrounding it. The other pool will be behind a curtain and not visable to the general public and will be for the athletes to warm up before they race and swim down after the race.

fina